Stress Measurement and Deformation Control of Support System in Shallow Light Railway Tunnel
CSTR:
Author:
Affiliation:

Clc Number:

U293.3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Combined with the real example of monitoring pressure on the supporting system in the long span underground space of DK7+692 section at Jiao-Xin line of Chongqing light railway,it is set forth the methods about choosing the support system and its parameter,digging methods of underground space,measuring and testing methods for the stress of the support system;the testing results and variation pattern were analyzed for the stress of the initial supporting I-steel,axial stress of bolt,stress of shot-concrete,supporting pressure of temporary I-steel and stress of steel of the second lining,then,the reason for deformation of the support system induced by sharp increase of I-steel was determined.Based on this,considering the real problem,the construction plan and the support system is changed,the deformation of support system was under control and the danger was avoided,the informative construction and construction safety were realized.

    Reference
    Related
    Cited by
Get Citation

贾剑青 王宏图 李晓红 胡国忠 陈庆 梅勇.浅埋轻轨隧道支护体应力监测及失稳控制[J].土木与环境工程学报(中英文),2006,28(1):67~70

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 28,2005
  • Revised:July 28,2005
  • Adopted:
  • Online:
  • Published:
Article QR Code