Abstract:The situation of asymmetric information makes a certain benefit conflict between owner and supervisor in the case of project supervision, and the owner undertakes the loss risk caused by information asymmetry. This paper has analyzed the management performance of the owner to the supervisor during the project supervision entrusting by a model.