Stress Measuring during the Construction Monitoring of Weisheng River Bridge in Guangzhou
CSTR:
Author:
Affiliation:

Clc Number:

U448.35 U446.2

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In this paper,the simulation calculation of Weisheng River Bridge was firstly conducted.Based on it,the measuring points and methods for stress measuring and calculation approach for real stress were introduced.The measured results matched the calculated results very well.Stress measuring during the construction monitoring can serve as references and guides of the structural situations during the different bridge construction process.

    Reference
    Related
    Cited by
Get Citation

李静 殷建军 王卫锋 贾鑫磊.广州广清卫生河大桥施工监控中的应力监测[J].土木与环境工程学报(中英文),2006,28(4):68~71

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 20,2006
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code