Prediction Model of Soil Erosion Amount in Highway Engineering during Construction Period in Mountainous Area
CSTR:
Author:
Affiliation:

Clc Number:

TU47

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The highway project in mountainous area will lead to serious soil erosion,due to its long road line and large volume of the work.While the program of water and soil conservation is drawn up,the prediction of the amount of soil erosion is needed. The whole amount of soil erosion comprises primary and new soil erosion amount. The primary soil erosion amount may be predicted by the method of average erosion modulus or universal soil loss equation.The new soil erosion amount is made up of erosion amount due to disturbed earth surface and discarded soil.Finally, the prediction model of soil erosion amount about a specific highway project during its construction period in mountainous area is analyzed.

    Reference
    Related
    Cited by
Get Citation

周富春.山区公路工程建设期水土流失量的预测模式[J].土木与环境工程学报(中英文),2006,28(5):27~29

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 15,2006
  • Revised:May 15,2006
  • Adopted:
  • Online:
  • Published:
Article QR Code