Study on the Projects of the Daily Regulation of Jinghong Hydroelectric Station on Lancang River
CSTR:
Author:
Affiliation:

Clc Number:

TV73

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The one dimension mathematical model has been adopted to study the projects of the daily regulation of hydroelectric station: the implicit format of Preissmann has been adopted to solve the equation.The program of one dimension unsteady flow has been worked out.The result of calculation of the program has been verified by the result of the physical model and the coincide well.Under 4 kinds of projects of the daily regulation of Jinghong Hydroelectric Station,the unsteady flow conditions in lower reaches of the dam with the length of about 85km have been calculated by the program.The graph has been adopted to analyze the important characteristic parameters of the unstable flow conditions of 4 kinds of projects: the range of water level per day,the range of water level per hours and the range of water level per 20 minutes.Finally,the project of the daily regulation of Jinghong Hydroelectric Station which has a smallest influence on the navigable flow conditions has been obtained.

    Reference
    Related
    Cited by
Get Citation

王云莉 刘亚辉 石永燕.澜沧江景洪电站日调节运行方案的研究[J].土木与环境工程学报(中英文),2006,28(5):43~46

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 15,2006
  • Revised:May 15,2006
  • Adopted:
  • Online:
  • Published:
Article QR Code