Design of Reef- blasting Project and Analysis of Regulation Effect for Fuling to Tongluo Canyon Reach in Three Gorges Reservoir Region
CSTR:
Author:
Affiliation:

Clc Number:

TV85

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    After the completion of the Three Gorges project,the navigation conditions of the reservoir region will be improved evidently,which has laid the foundation for straight run of the 10,000-ton-class fleet to Chongqing Port,and is the promotion of the development of shipping in Yangtze River.But according to the standard of the 10,000-ton-class fleet,there are still some reaches of the reservoir region can not meet the requirements of the waterway on smooth and safe navigation.Therefore,some regulation measures should be adopted to eliminate these obstructions.It is one of the important parts in the reservoir region waterway regulation work for the Fuling to Tongluo canyon reach blasting project.30 reef obstacle blocks of 14 reaches in this project were removed by blasting.Based on the analysis of obstruct features of various rocks,according to the standard of the 10,000-ton-class fleet,the design parameters and blasting regulation program were put forward,and the regulation effect is analyzed and forecasted.

    Reference
    Related
    Cited by
Get Citation

罗宏 朱俊凤.三峡库区涪陵至铜锣峡航道炸礁工程及效果分析[J].土木与环境工程学报(中英文),2006,28(5):47~50

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 15,2006
  • Revised:May 15,2006
  • Adopted:
  • Online:
  • Published:
Article QR Code