Abstract:Based on the model test of Jinghong power station on the Lancang river, the unfavorable navigation condition at entrance area of down approach channel of the ship lift is measured and analyzed for original design scheme of the project, and the open -type guide works is applied to greatly improve the bad flow condition, so as to make the navigation condition better at entrance area.