Existing Situation on Disposal of Sludge from Wastewater Treatment Plant in Three-Gorges Reservoir Area
Author:
Affiliation:

Clc Number:

X522

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    At present 18 wastewater treatment plants operateing in the Small towns of Three Gorge Areas of Chongqing Municipality, producing 132.95 tons surplus sludge everyday. As regards to the disposition of such numerous surplus sludge, the major disposition technique in these wastewater water treatment plants, i. e. , thickening and mechanical dewatering technique followed by feeding into the municipal solid waste landfill, seems to have a rather bad effect on the normal operation of the municipal solid waste landfill, due to the unstabilized sludge resulted from this technique of the sludge disposition and high moisture in the sludge, which is higher than 80%. This paper has paid some attention to this phenomenon. With respect to the small towns having the the municipal solid waste landfill, the techniques of mechanical dewatering, calcareousness stabilized etc. before feeding into the municipal solid waste landfill, seem to be feasible, while the composting and comprehensive utilization of sludge is available in the small towns which have no municipal solid waste landfills.

    Reference
    Related
    Cited by
Get Citation

何强 邹建 黄明.三峡库区污水处理厂污泥处置现状研究[J].土木与环境工程学报(中英文),2007,29(3):1~

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:February 05,2007
  • Adopted:
  • Online:
  • Published:
Article QR Code