3-D FEM Analysis of Tail Trace Tunnel in Wujiangdu Extension Project in P. R. China
CSTR:
Author:
Affiliation:

Clc Number:

TU45

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reference
    Related
    Cited by
Get Citation

刘先珊,刘新荣,王军.乌江渡扩机工程尾水岔洞三维有限元分析[J].土木与环境工程学报(中英文),2007,29(6):88~92

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:July 21,2007
  • Adopted:
  • Online:
  • Published:
Article QR Code