Abstract:For the large span and flat, together with the interaction effect of construction and disturbance of surrounding rock, the mechanical of large span and flat multiarch tunnel is very complicated, and the timespace effect is different from that of twolane multiarch tunnel or separated tunnel. Adopting the “CTSSSRH”, the 3D dynamic process of the tunnel construction was simulated. Analyzing the rule of surrounding rock displacement and stress with excavation, the timespace effect of large span and flat multiarch tunnel was proposed.