The Mechanism Analysis of Anticlogging Arching Structure in Dredged Sludge
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    A number of lands were occupied by discarding the dredged sludge in the yard as waste materials.The Aeration Vacuum rapid MudWater Separating (AVMWS) technique was appropriate for discarding yard with high water content and high clay particle content sludge.This technique could quickly reduce the volume of the sludge and accelerate the turnover use of the yard.In addition,the technique could overcome the clogging problem when pumping water from high watercontent, high clay particle content dredged sludge.Through the sampling particle size distribution tests after AVMWS and conventional vacuum pumping model tests, it was found that in the AVMWS tests the finegrained soil run off, coarse particles accumulated, and arching structure layer was formed.However, in the conventional vacuum pumping tests, fine particles did not lost and there was clogging without arching structure layer.The layer could protect the internal loss of the fine particles and ensure a high permeability of the soil at the same time.And the mechanism was explained as well.

    Reference
    Related
    Cited by
Get Citation

周源,高玉峰,陶辉.疏浚淤泥中的拱架结构防淤堵机理[J].土木与环境工程学报(中英文),2010,32(2):7~13

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 02,2009
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code