Transportation and Transformation of Pollutants in a New Type Constructed Wetland
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    A threestage seriesoperational pilot scale constructed wetland was built for domestic wastewater treatment with inflow of 4.5 m3/d .The mass balance method was adopted to quantify the transportation and transformation of pollutants in constructed wetland during steadystate operation.It was shown that the average removal rate of CODcr was 87.14%, in which 68.45% contributed by dissimilation and 18.69% contributed by assimilation.The average removal rate of TN was 60.21% and the contributions of denitrification and microbial assimilation or plant assimilation were 53.64%, 5.39% and 1.18%, respectively.The average removal rate of TP was 59.36% and the contributions of substrates absorption and microbial assimilation or plant assimilation were 43.55%, 12.26% and 3.55%,respectively.In conclusion, microorganisms played a key role in the removal of pollutants and substrates adsorption was the main approach to phosphorus removal.

    Reference
    Related
    Cited by
Get Citation

付国楷,张驰,张智,张媛,郭旋,林洁.污染物在人工复合生态床中的迁移转化途径[J].土木与环境工程学报(中英文),2010,32(2):122~127

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 12,2009
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code