Abstract:Based on an actual ground source heat pump system in hot summer and cold winter area, the system operation parameters were tested for 6 years under the state of using cooling tower for cooling in summer but the ground heat exchanger and fire pool for heating in winter. A three dimensional (3D) tube group model was established, and the thermal balance analysis and calculation of the ground temperature distribution around the ground heat exchanger were conducted by the numerical calculation. According to the comparison between the test data and the theoretical results, the influencing factors of the ground adjustment ability were obtained.