Waste Incineration Power Plant Operation Mode
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    combined with the current O&M model of domestic and overseas waste-to-energy plant, the essay analyses the strengths of specialized operation for waste-to-energy plant, put forwards two kinds of practical operation patterns, elaborates the aspects that need attention during specialized operation commissioning for waste-to-energy plant. This will push forward the positive development of operation commissioning of Chinese waste-to-energy plant.

    Reference
    Related
    Cited by
Get Citation

龚成.垃圾焚烧发电厂运营模式探讨[J].土木与环境工程学报(中英文),2013,35(Z2):92~94

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: February 25,2014
  • Published:
Article QR Code