Complex Variable Function Solution of Stress and Displacement of Surrounding Rock Buried Deep Horseshoe-Shaped Tunnel Excavation
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    An analytical solution was presented for the stresses and displacements around horseshoe-shaped tunnel using Cauchy integral method and Optimization theory in an elastic half-plane. Since the depth of a tunnel was larger than the size of the tunnel, gravity loads were simplified as uniform normal loads along far-field boundary. Finite element model was used to verify the accuracy of analytical solutions. Comparison between the results of numerical analysis by finite element method and those from the closed solutions indicates that the closed solution is reliable and applicable for the stress and displacement field around horseshoe-shaped tunnel tunnels at great depth.

    Reference
    Related
    Cited by
Get Citation

施有志,高轩能.深埋马蹄形隧道开挖围岩应力与位移的复变函数解[J].土木与环境工程学报(中英文),2014,36(1):101~105

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 28,2013
  • Revised:
  • Adopted:
  • Online: February 21,2014
  • Published:
Article QR Code