Analysis of Construction Risk for Water Piers and Foundations with Double-wall Steel Cofferdam Based on the Fuzzy Fault Tree Theory
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Construction risk for water piers and foundations with double-wall steel cofferdam was analyzed by the fuzzy fault tree theory. An evaluation method of construction risk for water piers and foundations with double-wall steel cofferdam was proposed. Fuzzy fault tree of construction risk for water piers and foundations with double-wall steel cofferdam was established based on Yingwuzhou Yangtze River Bridge. 31 bottom events were considered in fuzzy fault tree model according to 2 water pier and foundation with double-wall steel cofferdam. Key process of construction risk was obtained and risk prevention measures were proposed.Results showed that fuzzy number of construction risk probability for water piers and foundations with double-wall steel cofferdam was(0.05015,0.05278,0.05542). Construction risk of 2 water pier was highest. And weld leakage, pile broken and sand boiling were the key processes with higher construction risk. There fore appropriate prevention measures would be taken to reduce the construction risk for water piers and foundations with double-wall steel cofferdam.

    Reference
    Related
    Cited by
Get Citation

刘沐宇,荆武,张睿智.基于模糊故障树理论的双壁钢围堰水中墩施工风险分析[J].土木与环境工程学报(中英文),2014,36(6):34~40

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 06,2014
  • Revised:
  • Adopted:
  • Online: December 23,2014
  • Published:
Article QR Code