Construction of the Turbogenerator Elastic Platform for CPR1000 Nuclear Power Station
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Combined with the construction process of turbogenerator elastic platform for Ningde Nuclear Power Station, elaborated the technical difficulties and control measures during high formwork construction, spring vibration isolator installation, high precisi

    Reference
    Related
    Cited by
Get Citation

邓吉琳,靳希军.宁德核电站CPR1000汽轮发电机弹性平台施工技术[J].土木与环境工程学报(中英文),2014,36(Z1):44~49