Research on Calculating Integrated Weight of Risk in Subway Construction
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The application of the Analytic Hierarchy Process(AHP)has become popular in different areas of construction management. However, the comparison matrix(CM)is not consistent as required. An Improved AHP(IAHP) [25] was proposed to improve consistency by cons

    Reference
    Related
    Cited by
Get Citation

何德福.地铁施工期风险源综合权重的确定[J].土木与环境工程学报(中英文),2014,36(Z1):50~52

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 20,2014
  • Revised:
  • Adopted:
  • Online: September 10,2014
  • Published:
Article QR Code