Analysis model before cable replacement construction of stay cable bridge with time-dependent effects
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

National Natural Science Foundation of China(No. 51178059)

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to understand the cables forces and girder forces state of concrete cable-stayed bridge before the cable replacement construction, and to establish the analysis model of the bridge,the influence factors such as concrete creep & shrinkage, stress relaxation of prestressing tendons, element damage, overload of dead need to be evaluated . Creep, relaxation and shrinkage are closely associated with the material nonlinearity which dependent on time and stress history so it’s reasonable to adopt the finite element analysis technology based on elastic-plastic incremental load method. Based on the specified time intervals, the incremental elastic-plastic finite element equilibrium equation is deduced which includes the effect of creep, relaxation and shrinkage. For the time increment step, numeric expressions of creep, shrinkage and stress relaxation are established for beam element. Methods are proposed to analyze the influence of stay-cables damage and overload of dead. The methods will improve the structure state analysis techniques for the concrete cable-stayed bridge in service period.

    Reference
    Related
    Cited by
Get Citation

许红胜,王晟,颜东煌,林鸣.考虑时变因素修正的混凝土斜拉桥换索前初态模型[J].土木与环境工程学报(中英文),2015,37(4):45~50

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 04,2015
  • Revised:
  • Adopted:
  • Online: September 10,2015
  • Published:
Article QR Code