Xianyang international airport Iarge axial force bridge pile foundation underpinning technology test
DOI:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Tunnel under the Xi’an Subway Line crosses the main bridge pile of Xianyang International Airport, and thus active underpinning pile foundation treatment has to be used.Based on the combination of design engineering, we made underpinning beam (Beam-Pier-cap-pile connector) 1∶6 overall model,selected connecting surface of the joint type form of chiseling + drill anchorage + interface gel + prestressed,and underpinned the structure of the force performance and reliability of the analysis and demonstration.The results show that underpinning beam strength and stiffness can meet the requirements, the limit load of the specimen on its corresponding original underpinning girder is up to 9 900 t, and underpinning beam has a high load carrying capacity, ductility of the specimen is good and safe.Deformation coordination is under the upper large axial force bridge load,and the connection of chiseling + drill anchorage + interface gel + prestressed has the desired effect.

    Reference
    Related
    Cited by
Get Citation

李琳,李青宁,张立,岳克峰.咸阳国际机场大轴力桥梁桩基托换技术试验研究[J].土木与环境工程学报(中英文),2015,37(Z2):159~163

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 10,2015
  • Revised:
  • Adopted:
  • Online: March 14,2016
  • Published:
Article QR Code