Amendment of vacuum preloading technique in the application at Hainan sea flower Island and its improvement mechanism
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    At present, despite that the super soft soil foundation of the dredging silt is mainly strengthened by the vacuum-PVD consolidation method, the clogging is an important issue during the field application. With the vacuum preloading project of the Hengda Sea Flower Island in Hainan Province, a new type of anti-clogging vacuum preloading method for the super soft soil foundation is developed. It is the further improvement of the straight-line vacuum preloading method. The traditional PVD is replaced by the anti-clogging PVD, and the nonporous steel hose and tee sealing joint are also applied to update the traditional connections. Thereafter, the in-situ monitoring during vacuum and quality evaluation after construction is detailed introduced. The results verify the effectiveness and applicability of the preloading vacuum method' amendment. Combined with the existed laboratory model test, the principle of clogging in the vicinity of the PVD during vacuum preloading, and the mechanism of improved vacuum preloading are also discussed.

    Reference
    Related
    Cited by
Get Citation

陈祥龙,江舜武,金亚伟,邓永锋.海南海花岛软基处理工程中真空预压法的改进与机理分析[J].土木与环境工程学报(中英文),2017,39(2):75~83

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 22,2016
  • Revised:
  • Adopted:
  • Online: March 29,2017
  • Published:
Article QR Code