Abstract:The manual arrangement, which has some defects such as low utilization rate of production area, time-consuming and low leakage, was mostly adopted in traditional localization of prefabricated concrete (PC) elements in industrial production. Building Information Modeling (BIM) technology is applied in the industrial production of PC elements to improve the degree of management informatization, and thus the problems mentioned above can be solved to some extent. A parametrized modeling standard was developed and a PC information model was created using Revit software and the minimum horizontal line algorithm was improved. On the basis of information, the algorithm was used to arrange components, so as to improve the degree of information and productivity of PC components.