Lap splice length of U-shaped rebar loop in precast concrete structure
CSTR:
Author:
Affiliation:

1.Guilin University of Technology, Guilin 541000, Guangxi, P. R. China;2.Hezhou University, Hezhou 542800, Guangxi, P. R. China;3.East China Architectural Design & Research Institute Co., Ltd, Shanghai 200041, P. R. China;4.Hezhou Tonghao Prefabricated Construction Co., Ltd., Hezhou 542800, Guangxi, P. R. China;5.China Construction Fifth Engineering Bureau Co., Ltd. Shandong Branch, Jinan 250000, P. R. China

Clc Number:

TU375.4

Fund Project:

National Key Research and Development Program of China (No. 2016YFC0701902-4); Natural Science Foundation of Guangxi (No. 2018GXNSFAA050145); New Drive Development Project of Hezhou (No. ZX1907002, PT1907009)

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To study the lap splice length of U-shaped rebar loop in precast concrete structure, three fabricated specimens with different lap splice length and one cast-in-place beam-column joint comparison specimen were carried out for low-cycle repeated quasi-static tests. By observing the failure modes of each specimen, the corresponding hysteretic behavior, bearing capacity, deformation capacity, and the stress development process of reinforcement were studied, and then the reasonable lap splice length of U-shaped rebar loop in precast concrete structure was analyzed. The results show, (1) the bearing capacity of fabricated joints is higher than that of cast-in-place joints; (2) the ductility and energy dissipation capacity of specimens with different lap splice length are different; (3) the increase of lap splice length is conducive to the improvement of the bearing capacity, ductility, and energy dissipation capacity of specimens. Finally, based on the test results, the reasonable lap splice length of U-shaped rebar loop is fitted and regressed, and then the suggestions for the optimal design of the joint of the lap splice length of U-shaped rebar loop in precast concrete structure are putting forward.

    Reference
    Related
    Cited by
Get Citation

陈宜虎,陆鹏远,张敏,卢旦,刘丰收,秦稳.装配式混凝土U型钢筋环扣的连接长度[J].土木与环境工程学报(中英文),2023,45(2):131~140

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 21,2021
  • Revised:
  • Adopted:
  • Online: March 20,2023
  • Published:
Article QR Code