Causal analysis and disposal on large deformation of large section passenger dedicated line tunnel in inclined coal strata
CSTR:
Author:
Affiliation:

1.a School of Civil Engineering;2.b Key Laboratory of Rock and Underground Space Engineering;3.c. Institute of Tunnel and Underground Structure Engineering, Xi,an University of Architecture and Technology, Xi,an 710055, P. R. China;4.School of Architectural Engineering, Xuzhou College of Industrial Technology, Xuzhou 221000, Jiangsu, P. R. China;5.China Railway Construction Bridge Engineering Group Co., Ltd., Tianjin 300300, P. R. China;6.China Railway Beijing Engineering Bureau Group First Engineering Co., Ltd., Xi,an 710100, P. R. China

Clc Number:

U455.7

Fund Project:

National Natural Science Foundation of China (No. 52178393); Innovation Capability Support Plan of Shaanxi Province Innovation Team (No. 2020TD-005)

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    For Liujiazhuang railway tunnel of Shanghai-Kunming through the coal strata in construction of large deformation phenomenon, based on theoretical analysis, numerical simulation and field monitoring method, this study investigates the causes of significant deformation in tunnels, focusing on the initial locations of this deformation. It examines the impact of stress states on unit cells aligned with the inclined direction of a coal seam and explores the relationship between tunnel depth and horizontal distance in tilted strata. Additionally, the research analyses the stress and deformation experienced by the element body and the primary support structures in an inclined coal seam. The result showed that the stress state of the coal element above the palm face increases with the horizontal distance between the palm face and the bottom of the inclined coal seam, and the rock mass is subjected to three deformation stages including extrusion, compression shear and shear slip. The large deformation of surrounding rock and the failure of primary support structure both occur in the early stage of shear slip stage, so shotcreting to palm face, grouting reinforcement to coal seam up the palm face and strengthening the stiffness of primary support should be taken to prevent the large deformation of the tunnel in the stage of compression and shear deformation combined with the field monitoring data.

    Reference
    Related
    Cited by
Get Citation

康宝祥,宋战平,张庆贺,许晓静,周冠南,潘红伟.倾斜煤系地层大断面客专隧道大变形原因分析及处置[J].土木与环境工程学报(中英文),2024,46(2):89~99

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 16,2021
  • Revised:
  • Adopted:
  • Online: March 20,2024
  • Published:
Article QR Code