Calculation method for support distance determination under in-situ protection of buried box culverts
CSTR:
Author:
Affiliation:

1.Department of Underground Engineering, Nanjing Tech University, Nanjing 211816, P. R. China;2.Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University, Hangzhou 310058, P. R. China

Clc Number:

TU990.3

Fund Project:

National Natural Science Foundation of China (Nos. 52008208, 51308292); Natural Science Foundation of Jiangsu (No. BK20200707); Natural Science Research Projects of Universities in Jiangsu Province (No. 20KJB560029); Open Fund Project of Key Laboratory of Soft Soil and Environmental Geotechnical Ministry of Education (Zhejiang University) (No. 2020P04)

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Underground power pipelines are generally buried in the soil in the form of box culverts. When such existing pipelines are involved in underground construction, the in-situ support protection method is generally used to ensure the stability of the box culvert during the construction process. The determination of the distance between the support points mainly depends on the engineering experience. In this paper, considering the cross-sectional properties of the box culvert and the settlement effect in the soil, the mechanical models of the middle-span and the side-span of the box culvert are respectively established, the vertical displacement of the box culvert is calculated, and the allowable support points are deduced. Based on the maximum spacing value, a calculation method for the spacing between the support points of buried box culverts under in-situ support protection is proposed, and the accuracy and engineering suitability of the calculation method are verified by a case of the in-situ protection project of large-diameter pipe culverts at Yunnan Road Station of Nanjing Metro Line No. 5. The full-span longitudinal deformation pattern and parameter sensitivity of the buried box culvert are further analyzed through numerical simulation. The research shows that: the spacing between the supporting points of the box culvert side span is 8 m, the spacing of the middle span is 8.73 m, and at least 12 supporting points need to be set for the whole span. Within the range of three times of parameter magnification, with increase of reinforcement depth, width and soil compressive modulus, the displacement of the box culvert gradually decreases.

    Reference
    Related
    Cited by
Get Citation

邓声君,胡东,刘恒,付丽,林洹宇,蒋刚.原位支撑保护下埋地箱涵支撑点间距计算方法[J].土木与环境工程学报(中英文),2025,47(2):107~115

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:September 04,2022
  • Revised:
  • Adopted:
  • Online: March 10,2025
  • Published:
Article QR Code