Field monitoring on mechanical performance of rock bolt reinforced foundation of wind turbine
CSTR:
Author:
Affiliation:

1.School of Civil Engineering, Shandong Jianzhu University, Jinan 250101, P. R. China;2.Key Laboratory of Building Structural Retrofitting and Underground Space Engineering, Shandong Jianzhu University, Jinan 250101, P. R. China;3.Subway Protection Research Institute, Shandong Jianzhu University, Jinan 250101, P. R. China;4.Shandong Jianhe Civil Engineering Consulting Co., Ltd., Jinan 250013, P. R. China;5.Shandong Dawei International Architecture Design Co., Ltd., Jinan 250100, P. R. China

Clc Number:

TU476

Fund Project:

Natural Science Foundation of Shandong Province (No. ZR2019MEE021)

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The loading condition on the wind turbine during operation is complex. Therefore, based on a wind turbine foundation reinforcement project in Weihai, a systematic monitoring method is proposed to evaluate the performance improvement effect of the reinforced foundation in combination with the field environment. From the construction stage to the operation stage, the tower strain, welding stud strain, and anchor cable axial force of the reinforced foundation are collected to study the stress response of the wind turbine reinforced foundation under different working conditions, conduct correlation analysis, and to explore the performance improvement effect and load transfer mechanism after foundation reinforcement. The results show that the stress response of each component in the reinforcement area has trend similarity and amplitude difference, and the stress improvement effect is obvious with a large safety margin. The reinforcement method changes the stress boundary of the structure by using outsourcing concrete and welding studs, increases the restraint stiffness of the bottom tower, redistributes the upper transferred load, shares the transferred shear force, and ensures the common deformation of the tower and concrete.The systematic monitoring and evaluation method based on this reinforcement scheme can effectively and timely assess the stress state of each component of the reinforcement system and ensure the safety of the subsequent wind turbine operation. The reinforcement scheme improves the stress state of the foundation, rock bolt and flange, and the overall mechanical performance of the foundation is guaranteed.

    Reference
    Related
    Cited by
Get Citation

魏焕卫,雷树立,宋志鑫,陈朝伟,惠俊梅,宋鹏,郑晓.风电机组岩石锚杆式加固基础受力性能现场监测研究[J].土木与环境工程学报(中英文),2025,47(5):177~185

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 17,2023
  • Revised:
  • Adopted:
  • Online: November 03,2025
  • Published:
Article QR Code