Deformation characteristics of soft soil deep foundation pit partitioned excavation
CSTR:
Author:
Affiliation:

1.Zhejiang Geology and Mineral Construction Co., Ltd., Hangzhou 310053, P. R. China;2.Jiangxi Key Laboratory of Infrastructure Safety Control in Geotechnical Engineering (East China Jiaotong University), Nanchang 330013, P. R. China;3.Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University, Hangzhou 310058, P. R. China;4.China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430061, P. R. China

Clc Number:

TU753.1

Fund Project:

National Key R & D Program of China (No. 2023YFC3009400); National Natural Science Foundation of China (No. 52238009); The National Science Fund of Jiangxi Province (No. 20223BBG71018)

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In this study, the deep foundation pit project of No.4 Wangjiang New City of Hangzhou New World is taken as a case study, and the zonal excavation process of the foundation pit is comprehensively monitored. Through the in-depth analysis of the monitoring data of the diaphragm wall deformation, soil inclinometer measurements,wall top settlement, and ground settlement outside the pit, and combined with the numerical model of the foundation pit zonal excavation established by PLAXIS 3D, we compare the numerical simulation results with the actual monitoring data to validate the accuracy of the model and to supplement the insufficiency of the monitoring data. The results show that the deformation of the diaphragm wall during the excavation of the foundation pit presents a typical parabolic variation pattern, and a push-back displacement toward the pit occurs during the post-excavation construction stage. The deformation characteristics of the soil outside the pit are similar to those of the diaphragm wall, but its deformation magnitude is relatively small. With the progress of foundation pit excavation, the ground settlement outside the pit increases gradually, and its displacement curve deviates from the traditional parabolic variation pattern due to the influence of environmental factors. In addition, the wall top settlement shows a clear trend of “first heave and then settle” during the foundation pit excavation and the construction of the main structure inside the pit.

    Reference
    Related
    Cited by
Get Citation

陈南桥,王雪鹏,林刚,徐长节,熊毅,曹化锦.软土深基坑分区开挖变形规律[J].土木与环境工程学报(中英文),2026,48(1):89~99

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 05,2024
  • Revised:
  • Adopted:
  • Online: February 26,2026
  • Published:
Article QR Code