1.Zhejiang Huadong Geotechnical Investigation & Design Institute Company Limited, Hangzhou 310030, P. R. China;2.Power China Huadong Engineering Corporation Limited, Hangzhou 310014, P. R. China;3.State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology, Chengdu 610059, P. R. China
TU452
National Natural Science Foundation of China (No.41977237)
王平,杨锦,王敬勇,吉锋.考虑时效损伤的变系数非定分数阶岩石卸荷蠕变模型[J].土木与环境工程学报(中英文),2026,48(4):71~79
Copy
