Archive > Volume 15 Issue 3 > 1992,15(3):128-133 CSTR:[cstr] Prev Next

THE ANALYSIS OF MECHANICAL CONSTRUCTION OF SURROUNDING ROCKS IN THE PITCHING SEAM