TM711
This paper discusses the problem of long-range generation expansion planning. A dynamic model for long-range expansion planning is set up and an algorithm-a two-step programming is presented, which is used here in a case.
杨秀苔 聂端.一种电源扩展动态规划模型与算法[J].重庆大学学报,1993,16(4):6~10