A Fuzzy Regression Method for Long-Term and Medium-Term Load Forecasting
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TM715

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of the observation data fuzziness and load pattern fuzziness,a new fuzzy regression prediction method was presented for long-term and medium-term load forecasting. With the established fuzzy regression model, the future load value can be forecasted based on the fuzzy historical observation data. The validity of the proposed method was verified with the numerical example of a practical system.

    Reference
    Related
    Cited by
Get Citation

孙洪波 徐国禹.中长期电力负荷的模糊回归预测[J].重庆大学学报,1993,16(6):16~20

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code