The Feasible Control for the Day-operation of the Three-Gorge Cascade Hydropower Station
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TV737 TP273

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The feasible control problem is presented for the day-operation of the Three-Gorge Caseade Hydropower Station. The significance of the problem is explained. Basic propetties ofthe problem and the approaches to study it are discussed. Two methfods are given for solving theproblem. which are calculus of variation and linear programming. In the former. the Euler equationwith time-lag and the generalised two-point boundary conditions are obtained and the correspondingpractical implication is interpreted. In the latter. the rationality for the discrete model is exptainedand the computalional details are given for the implement software. some questions which should bepaid much attentfon and the corresponding propeels are prasented based on the numerical results andtheoretical analysis

    Reference
    Related
    Cited by
Get Citation

段虞荣 傅鹏.三峡梯级电站日运行容许控制[J].重庆大学学报,1995,18(1):19~26

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code