Schedule of Two level Multi object based on Relatively Prior Weight
Article
Figures
Metrics
Preview PDF
Reference
Related
Cited by
Materials
Abstract:
The default of conventional schedule is expounded, which only emphasizes on system's overall object but overlooks sub system's local object. A mathematical model of two level multi object is put forward. The concept of relatively prior weight is defined, and a heuristic algorithm is given out. The results of computer simulation show that the algorithm is effective.