A Test and Analyzing System of Manufacture Errors onPlang-generated Hourglass Worm
CSTR:
Author:
Affiliation:

Clc Number:

TH161

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Aiming at solving the matter of fact of manufacture errors on worm, the worm test apparatus is studied by the tool research department in Chengdu.A kind of improved principle,hardware and software design of the project is discussed. The primary aim of the single chip microcomputer circuit of this project is data collecting, and the invention monopoly of professor Zhangguanghui of Chongqing university is applied. The high frequency inserted pulse is used, and the software is joined in constitute subsidiary calibration distributed on equal time. The task of online subdivision in the dynamic measure process is completed. The data are passed to PC, PC handle them and examination result is gotten. The integration of the process is very high, and the tedious and complicated hardware circuit is simplified like the tradition examination method.

    Reference
    Related
    Cited by
Get Citation

孙书民 张光辉.环面蜗杆制造误差的检测分析[J].重庆大学学报,2003,26(3):130~132153

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code