Voltage and Reactive Power Optimization of Main Electric Power Network in Chongqing
CSTR:
Author:
Affiliation:

Clc Number:

TM714.3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Based on the reactive surplus of Chongqing 220 kV main electric power network under low water and low load, and on state of higher system voltage, a thorough research is done on voltage and reactive power of the system power network by means of calculation,analysis and experiments. A main network calculating equivalence model of power network in Chongqing is constructed. And reactive power optimizing calculation is figured out on the Chongqing power network on condition that the loss minimum of the active power network is object function. Several optimizing compensatory schemes are put forward. Based on the calculation result and the analysis of all schemes, the most reasonable and feasible optimizing scheme could be achieved. Meanwhile, the feasibility that the system voltage could be adjusted when generator operating under excitation was demonstrated. According to the experience of under-excitation operation of the same type units , it decreases the system voltage, improves Chongqing power network running performance, and strengthens the coordination and stabilization of system.

    Reference
    Related
    Cited by
Get Citation

陈刚 吴迎霞 张继红 刘绍亭.重庆电网主网电压及无功优化问题分析[J].重庆大学学报,2003,26(7):66~69

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:March 18,2003
  • Adopted:
  • Online:
  • Published:
Article QR Code