Applications of Monitoring Measurement Technology in Tongyu Tunnel
CSTR:
Author:
Affiliation:

Clc Number:

U456.3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Chongqing Tongyu tunnel is a key part of 8 HOURS CHONGQING engineering, which has complex geological conditions, such as water, rock blast, methane, hazard gases, high in situ stress, can fully stand for long broad highway tunnel under complex geological conditions. Monitoring measurement of NATM was strictly done in the construction, such as geological description of the work surface, submergence of ground, the axial stress of roof bolt, the sprayed coatings stress, the pressure of steel tunnel liner plate, inner strain of surrounding rock, the stress of after-coating of concrete, which are related to the stability of surrounding rock and the rationality of support. From the feedback of this information, all the work has been proved efficient, the exit part has already advanced 1 500 m safely. The application of monitoring measurement technology in the tunnel construction will be introduced in the paper.

    Reference
    Related
    Cited by
Get Citation

李晓红 康勇 顾义磊 唐伯明 杨君 胡世斌.监控量测技术在通渝隧道出口段中的应用[J].重庆大学学报,2003,26(9):1~5

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:April 11,2003
  • Adopted:
  • Online:
  • Published:
Article QR Code