Variation Controlling of Construction Contract Performing
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

F284

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper analyzes all kinds of civil engineering variations, such as design variation, construction variation, plan variation, condition variation and new added project. It describes their basic characteristics. It discusses controlling procedure of design variation and construction variation raised by contractor. In the end, controlling principles on civil engineering variations are put forward, such as double-effect principle, encouraging principle, layer and class principle and value principle.

    Reference
    Related
    Cited by
Get Citation

方俊,任宏.建设工程施工合同履约中的变更控制[J].重庆大学学报,2004,27(6):137~139

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:March 20,2004
  • Adopted:
  • Online:
  • Published:
Article QR Code