Risk Decision-making Method of Slope Resistant Engineering
CSTR:
Author:
Affiliation:

Clc Number:

X43

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Considering the character of slope resistant engineering invest benefit, in line with security and economy balmaced, combining initial investment and anticipated hazard loss, disaster resistant engineering should be satisfied with the criterion of minimum cost. Decision tree model is adopted as analyzing means, and risk decision-making of slope design is carried out. Project input-output radio adopting dynamic analysis can reflect project investment benefit more accurately. At last this paper analyzes some questions in process of slope resistant engineering with benefits enumerate.

    Reference
    Related
    Cited by
Get Citation

李东升,刘东燕.边坡防灾工程风险决策分析[J].重庆大学学报,2005,28(12):104~107

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 05,2005
  • Revised:July 05,2005
  • Adopted:
  • Online:
  • Published:
Article QR Code