New Operation Method of 35 kV Power System in Mountainous Area
CSTR:
Author:
Affiliation:

Clc Number:

TM863

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The unbalanced nature of 35 kV distribution system due to capacity values is difficult in neutral operation, which can not meet the demand of voltage balance in static state and arc distinct in fault. This paper proposes a new neutral operation as neutral insulation in static state and resonance grounding in fault , along with EMTP simulation acts. Simulation indicates that new neutral operation method can improve lightning withstand level and decrease trip-out rate of grids.

    Reference
    Related
    Cited by
Get Citation

刘渝根 丁伯剑 陈先禄 袁涛 许文强.山区35kV电网新型运行方式探讨[J].重庆大学学报,2006,29(5):40~43

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 10,2006
  • Revised:January 10,2006
  • Adopted:
  • Online:
  • Published:
Article QR Code