Archive > Volume 29 Issue 5 > 2006,29(5):52-54. DOI:10.11835/j.issn.1000-582X.2006.05.014 CSTR:[cstr] Prev Next

Calculation of Maintenance Cost Based on the Proportional Life Setback Model