Feasibility Analysis of Exploitation "City of Hot Spring" in Chongqing
Article
Figures
Metrics
Preview PDF
Reference
Related
Cited by
Materials
Abstract:
In Chongqing,the South Hot Spring,Small Hot Spring,and West Hot Spring,do not flow automatically;the flux of North Hot Spring and East Hot Spring Have fallen.The geothermal water did not flow through the geothermal water hole of East Hot Spring.However,the exploitation of "city of hot spring" is plan after 5 year.The paper discusses the hydro-geological conditions,the dynamic hot springs and correlativity among hot springs,analyzes the replenishment conditions and capacity of store water,and the correlativity among the exploitation points of "city of hot spring".It shows that the exploitation of "city of hot spring" is feasible.But in order to exploit "city of hot spring" sustain-ably,the whole yield of "city of hot spring" along with should be planned the every hot spring yield in a geothermal water system of anticline.