Hydrogeological Investigation and Prediction of Water Yield of Jigong Mountain Tunnel
CSTR:
Author:
Affiliation:

Clc Number:

TV124

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Jigong Mountain Tunnel is a controlled project in the reconstruction of Xinyang-Chenjiahe section.Based on hydrogeological investigation,tunnel's hydrogeology character such as geological structure,development of surface water and underground water,recharge of surface water and groundwater is evaluated,and normal and maximum water yield are predicted in the way of groundwater runoff modulus.It has been shown that normal and maximum water yield are equal to 860 m3/d and 1 283 m3/d,so the whole tunnel is a poor water section,while the speculated are ebbing water ones.

    Reference
    Related
    Cited by
Get Citation

任佳,胡国忠,职晓阳,贺建明,王宏图.鸡公山隧道水文地质勘察分析及涌水量预测[J].重庆大学学报,2007,30(4):52~55

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:December 17,2006
  • Adopted:
  • Online:
  • Published:
Article QR Code