Partial Pressure Problem About Continuous Rigid Frame Bridge Anchorage Zone of Thin Concrete Box Girder Webs Carrying Large Tonnage
CSTR:
Author:
Affiliation:

Clc Number:

U448.23

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    With continuous rigid frame bridge span increasing,cantilever construction of large tonnage anchor are also becoming more common,but local stress distribution is complicated on prestressed anchorage zone of thin concrete box girder webs by the large tonnage,which reveals its distribution of post-tensioned concrete bridge structure to be solved in the future.Based on the theory,some key points such as pressure factors,destruction and the reasons for the compression type crack were discussed in the paper.By using the North Approach continuous rigid frame concrete bridge of Yangtze River Bridge project example,the local compression strength,crack resistance and the smallest protective layer thickness of the first segment of one continuous rigid frame box girder bridge under design value Rally 4882.5 kN of No.T2 tendom,according to the local pressure formulas of Code for Design of Highway Reinforced Concrete and Pre-stressed Concrete Bridges and Culverts of China(JTG D62-2004) and Finite Element Method,were checking.Both the results verify that meets the standard requirements.The results reveal that the design of a web-Laced with horizontal steel mesh sealed off side stirrup can solve the partial pressure problem.

    Reference
    Related
    Cited by
Get Citation

杨转运,张亮亮,刘会.薄壁箱梁大吨位预压力锚固区局部承压[J].重庆大学学报,2007,30(6):114~120

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:February 27,2007
  • Adopted:
  • Online:
  • Published:
Article QR Code