A multifactor forecasting model for continuous beam bridges
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    It is necessary to predict and control deflection and stress in continuous beam bridge construction. SCGMmv (1, h) is a multifactor forecasting model for a time series based on the mean values. For a specific project, by using the association between deflection and stress, the SCGMmv (1, h) forecasting model is employed to obtain forecast values of deflection and stress, which are compared with the forecast values of the GM (1,1) prediction model. The results show that the SCGMmv (1, h) multifactor forecasting model is feasible and effective for deflection and stress prediction in continuous beam bridge construction.

    Reference
    Related
    Cited by
Get Citation

陈为真,汪秉文,胡晓娅.多因子预测模型在连续梁桥中的应用[J].重庆大学学报,2009,32(3):353~356

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code