Archive > Volume 32 Issue 8 > 2009,32(8):897-903. DOI:10.11835/j.issn.1000-582X.2009.08.008 CSTR:[cstr] Prev Next

Analysis of shift schedule for the automatic transmission vehicle based on fuzzy neural network