Archive > Volume 33 Issue 3 > 2010,33(3):108-113. DOI:10.11835/j.issn.1000-582X.2010.03.020 CSTR:[cstr] Prev Next

Optimal model on integrated production planning andscheduling of steelmaking and continuous casting process