The analysis on presplitting blasting to improve permeability draining rate in heading excavation
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Aiming at the problem of low excavation speed and high risk of coal and gas outburst because of low gas draining rate in heading excavation,and taking an excavation heading of a mine for example,the test of deephole presplitting blasting is processed.The amount of gas draining after presplitting is compared with the amount of direct draining,and the effective radius of draining is surveyed.The test result shows that the draining rate of K1 coal seam reaches 37.13 %,which reduces the draining time by 60%,10 days after presplitting,and the gas desorption index exceeds the standards until the fifth blasting.The draining rate of K4 needs 12 days to reach 34.28 %,which reduces the draining time by 60%,and the gas desorption index exceeds the standards when the third blasting processes.Obviously,the effect of gas draining is improved by presplitting blasting.The effective draining radius of K1 and K4 are 4.5 and 5.2 m respectively after presplitting blasting.The research can provide reference for the fieldwork of presplitting blasting.

    Reference
    Related
    Cited by
Get Citation

范晓刚,王宏图,袁志刚,徐厚学.煤巷掘进中预裂爆破对抽放提高的分析[J].重庆大学学报,2010,33(9):69~73

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 03,2010
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code