A telemetring technique on deformation of large tower
CSTR:
Author:
  • Article
  • | |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • | |
  • Comments
    Abstract:

    This paper describes a telemetring technique on deformation of large Electrical Power Equipment. We install n radio beacons apart Δ Hi each other at large structure. The carriers of n beacons are same but modulated by different orthogonal PN codes. So the telemetring equipment can divide the carriers of n beacons. The phase detectors measure the phase difference between the ith carrier and ( i -1)th carrier Δ θi(i=2, 3…n) . The corresponding deformations are Δ Li =Δ θi/360×λ(i=2, 3…n) .The deformation curve can be deduced from Δ Li and Δ Hi(i=2, 3…n) . The method to eliminate the interference between the modulated carriers is presented .The simulation test is conducted and the result of the simulation proves the effectiveness of the proposed technique.

    Reference
    Related
    Cited by
Get Citation

杨力生,曹海林,杨士中,王韬.高大杆塔变形的无线电测量技术[J].重庆大学学报,2011,34(2):19~25

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 09,2010
Article QR Code