Comprehensive dynamic fuzzy evaluation for construction safety of manual digging pile in limestone area
CSTR:
Author:
  • Article
  • | |
  • Metrics
  • | |
  • Related [20]
  • |
  • Cited by [0]
  • | |
  • Comments
    Abstract:

    Based on the analysis of construction characteristics of manual digging pile in karst region, a scientific, timely and dynamic safety assessment system is the established and fuzzy AHP(analytic hierarchy process)is used to conduct a comprehensive safety assessment. The results are accordant with the actual situation and the construction practice has proved that fuzzy AHP is feasible to evaluate manual digging pile construction safety and good results can be achieved.

    Reference
    Comments
    Comments
    分享到微博
    Submit
Get Citation

何现启,张清,朱自强,鲁光银,柳群义,李建慧.灰岩地区人工挖孔桩施工安全综合动态模糊评价[J].重庆大学学报,2011,34(3):132~137

Copy
Share
Article Metrics
  • Abstract:2064
  • PDF: 1432
  • HTML: 0
  • Cited by: 0
History
  • Received:October 12,2010
Article QR Code