Optimization of in-pit haulage system development during internal dumping in seasonal stripping surface coal mine
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    For the features of long haul distances and high motor transport haulage cost during internal dumping in near horizontal surface coal mine with seasonal stripping,on the basis of theoretical calculation and analysis,the paper proposes a thought that building temporary connection bridges to optimize in-pit haulage system development. And an techno-economic analysis about form and building requirements of temporary connection bridges is made,the parameters model and optimization algorithm of temporary connection bridges are provided. The research production has been practical applied to West 2 surface coal mine of Mengdong energy holdings co.,LTD. The results show that building temporary connection bridges to optimize in-pit haulage system development generates remarkable economical benefits.

    Reference
    Related
    Cited by
Get Citation

白润才,刘闯,刘光伟,曹博.季节性剥离露天煤矿内排开拓运输系统优化[J].重庆大学学报,2014,37(8):99~104

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 08,2014
  • Revised:
  • Adopted:
  • Online: October 30,2014
  • Published:
Article QR Code